
KERUI Electric Motor Recycling Machine
Performance of KERUI Electric Motor Recycling Machine
Purity of the finish productsOver 99%
Electric Motor Recycling Process

The KRMC heavy metal crusher process the scrap motor rotors into the separated wires mixed with iron components and use the strong magnetic separator to separate the iron components to get the enamelled wires mixed with plastic.
The KR copper wire granulation machine can process the enamelled wires with the plastic to get the pure copper. Through crushing the enamelled wires to strip the painting to get the copper and plastic mixture then the stripped painting and some fibers of the material will be gathered by the dust collection system, then the copper plastic mixture will be separated by the air separator.
Technical Parameters of KERUI Electric Motor Recycling Machine
Heavy Metal Crusher
Model |
Power(KW) |
Rotation Rate (r/min) |
Capacity (Kg/h) |
Dimension(mm) |
Weight(T) |
|||||
KRMC-600 |
18.5-22 |
2100 |
600-800 |
2000*700*2000 |
1.5 |
|||||
KRMC-800 |
30-37 |
1600 |
800-1200 |
2200*900*2200 |
3.7 |
|||||
KRMC-1000 |
45-55 |
1250 |
1200-1500 |
3800*1400*3000 |
7.6 |
|||||
KRMC-1400 |
90-150 |
860 |
4000-5000 |
4000*1500*2800 |
11.5 |
|||||
KRMC-1600 |
110-180 |
750 |
6000-10000 |
4800*2000*3200 |
16.6 |
|||||
KRMC-2000 |
220-320 |
650 |
8000-12000 |
5000*2200*3400 |
28.6 |
Granulation Machine
Model |
Power(kw) |
Capacity (kg/h) |
Dimension(mm) |
Weight(kg) |
||||
KR600 |
45 |
300-500 |
4000*1900*2300 |
3800 |
||||
KR800 |
60 |
600-800 |
6500*2300*2300 |
6500 |
||||
KR1200 |
100 |
1000-1200 |
8000*5000*2400 |
8000 |
Our Services
Pre sale service:
1. We can recommend the proper proposal accordingly to meet customer’s request then help customer to choose the proper equipment.
2. Provide the detailed technical parameter of each equipment.
3. Free technical advice.
4. Introduce the relative equipment.
On-purchase service:
1. Report customer the working condition of the order regularly.
2. Pack the machine in export standard.
3. Notice the shipping date in advance.
After sales service
1.Installation&operation: We will guide the user to install the machine on line and help the user to adjust the machine when user changes the raw material. We will inquire user to learn the working condition of the machine regularly and give advice till the user totally know the machine.
2.Warranty: brand new when leaving the factory. we guarantee quality of the machines for a period of one year from the date of a trial run to the finish, but not to exceed thirteen months from the date of which machines away to the delivery port. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost. After one year, parts can be replaced on favorable payment basis.
3.Long time free technical support.